This project is constructed in a remote location of West Africa, requiring significant thinking on reliability and redundancy of the design.
Additionally, the project had an aggressive delivery schedule, requiring fabrication and quality assurance to be fully completed within 50 weeks from initiation of engineering.
We delivered the integrated scope of work on time, from eleven different fabricator workshops to marry with the global logistics plan to site. This project execution required a significant increase in internal resources and external contractors to ensure that timelines and deliverables would be met.
The project remains in construction, with commissioning intended for Q1 2025. This plant has been designed for 15Mtpa but with expansion possibilities in-line for 20Mpta in 2026.