The project was delivered amidst the COVID-19 pandemic, requiring integration of both physical and digital assets to ensure successful delivery. We commissioned the plant in-country despite challenges with personnel mobility, physical quarantines, and unavailability of skilled labour/resources.
We installed three CX6-120 (120 m2) ceramic disc vacuum filtration system for use in dewatering of the cyanide detoxified CIL gold tailings produced by this underground mining operation in southwestern Ghana.
By combining filtration and paste backfill techniques, surface slurried tailings disposal is now limited. This project has enhanced fresh process water recovery for the concentrator and resulted in better underground efficiency due to transitioning away from cemented-rockfill.